JH came over and we (I should say he, I just watched and handed him tools) got the wiring done, but there wasn't time to get the lights put in, nor did we have all the equipment. For the record, the store did not have the switches we needed, so I need to go elsewhere.
In the meantime, the front is ready to be wired and the lights installed. I ran into an electrician at the library and he gave some advice about how to do the lights. He said what they do is use a pine board to frame the light, then put the clapboards around that. Say no more, sounds good to me.
I just need to find some wood, cut a hole, and then I'm in business. I could even put the board in without the light, but we'll see how that goes. I do, however, forsee that this could be finished and done before the new year. How crazy would that be?
Then again, crazier things have happened. Until the next time, thanks for reading.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment