Tuesday, June 7, 2011

Almost Done with the FEBP

We’re almost done with the installation part of the FEBP. Of course, there is still the issue of painting it, and for that matter, choosing a color, but before all of that, I have to install the last pieces of trim in between the trim. This won’t be easy, because the space is narrow and long, so ripping a piece that will fight snugly will be a challenge. Then again, what do real-men in training long for but a challenge? If I had planned this properly, which is as unlikely as snow in July, I would have installed the internal piece before nailing the trim, but now I have to do it after the fact. Who thinks of these things beforehand?

Either way, it won’t necessarily be difficult, just tedious, and those are the kinds of things that can be a chore when you’re a framer and not a cabinet maker.

Until the next time, thanks for reading.

No comments: