Tuesday, April 10, 2012

Last Step for the Well

One of the important steps for getting the barn finished is finallizing the water system, and that requires the input of the septic engineer. I had no idea this was all part of the process, but apparently before the house becomes official, the engineer has to do one final inspection (done) and then, once the water is connected, he informs the state that the job is complete. I thought you just hooked up the water and took a bath. There were a couple of issues that we needed to address, like securing the pump lid on, which was pretty easy (even I could do it), but that’s all been taken care of.

What’s pretty cool is that there is now water in that barn. Can you believe it? KB hooked the pipes up and now it’s ready to rock and roll. Crazy. I think the electrical is getting to where it needs to be done, and we need to make some insulation decisions, which is never easy, but we are well on our way.

Until the next time, thanks for reading.